top of page

PROJECTS

Our work reconciles form,

schedule, sustainability,

constructability, and budget.

Pumphouse Apartments
Village House
Remai Modern

Pumphouse Apartments (Winnipeg, MB)

-

Connection Design & Miscellaneous Steel Design

Remai Modern (Saskatoon, SK)

-

Delegated Design

Village House (Winnipeg, MB)

-

Structural Design

FEATURED PROJECTS

Edgewater Condominiums

Edgewater Condominiums (Winnipeg, MB)

-

Connection Design

300 Main

300 Main (Winnipeg, MB)

-

Delegated Design

The Spot at East Village

The  Spot at East Village (Winnipeg, MB)

-

Delegated Design

Kennedy LRT Station

Kennedy LRT Station  (Scarborough, ON)

-

Connection Design

Blatchford Dess Energy Centre One

Blatchford Dess Energy Centre One (Edmonton, AB)

-

Connection Design

Keelesdale LRT Station

Keelesdale LRT Station  (Toronto, ON)

-

Connection Design

Club Regent Casino

Club Regent Casino  (Winnipeg, MB)

-

Connection Design

Grand Lyon Terrace

Grand Lyon Terrace (Winnipeg, MB)

-

Connection Design

92 Arthur Street

92 Arthur Street  (Winnipeg, MB)

-

Post-Structural Failure Repairs

OTHER PROJECTS

-     Hylife Feedmill (Niverville, MB) - Deep Foundation Design

-     Edmonton Solid Waste (Edmonton, AB) - Connection Design

-     Haney-Eldridge Chamber (Winnipeg, MB) - Excavation Shoring

-     Downtown Sky-walk (Winnipeg, MB) - Connection Design

-     Calm Air Addition (Thompson, MB) - Structural Design​​​

-     Punjab Cultural Center (Winnipeg, MB) - Connection Design

​​​

-     Gladstone Inland Grain Terminal Boot Pit (Gladstone, MB) - Excavation Shoring

-     Salisbury House Restaurant (Steinbach, MB) - Structural Design

-     Grace Hospital Emergency Department (Winnipeg, MB) - Connection Design

-     New Lakehead Elementary School (Thunder Bay, ON) - Connection Design

bottom of page